| DOE/EA-1682D |
Draft Environmental Assessment for Upgrades and Life Extension of the 242-A Evaporator, Hanford Site, Richland, Washington Conducted Under the American Recovery and Reinvestment Act of 2009 (08/2009) |
| DOE/EA-1674 |
Environmental Assessment for 10 CFR 431 Energy Conservation Program: Energy Conservation Standards for Refrigerated Bottled or Canned Beverage Vending Machines (08/2009) |
| DOE/EA-1673 |
Environmental Assessment for Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment (07/2009) |
| DOE/EA-1664 |
Environmental Assessment for 10 CFR Part 430 Energy Conservation Standards: Energy Conservation Standards for Fluorescent and Incandescent Lamps (06/2009) |
| DOE/EA-1662 |
Environmental Assessment for 10 CFR Part 430 Energy Conservation Program: Energy Conservation Standards for Certain Consumer Products (Dishwashers, Dehumidifiers, Microwave Ovens, and Electric and Gas Kitchen Ranges and Ovens) and for Certain Commercial and Industrial Equipment (Commercial Clothes Washers) (04/2009) (pdf 1.04mb) |
| DOE/EA-1660 |
Environmental Assessment for Combined Community Communications Facility and Infrastructure Cleanup on Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington (07/2009) |
| DOE/EA-1659 |
Environmental Assessment for Proposed Demolition of Building 330 at Argonne National Laboratory (08/2009) |
| DOE/EA-1655 |
Final Environmental Assessment for The Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development (09/2009) |
| DOE/EA-1652 |
Environmental Assessment for the Wind Technology Testing Center (08/2009) |
| DOE/EA-1650 |
Environmental Assessment for the Freeport LNG Export Project and BOG/Truck Project (05/2009) (pdf 1.62mb) |
| DOE/EA-1649 |
Sabine Pass LNG Export Project Environmental Assessment (02/2009) (pdf 385.09kb) |
| DOE/EA-1648 |
Final Environmental Assessment for the White Earth Nation Wind Energy Project Becker County, Minnesota, White Earth Indian Reservation, U.S.A. (04/2009) (pdf 11.07kb) |
| DOE/EA-1647 |
Supplemental Environmental Assessment for Construction and Operation of a Proposed Cellulosic Ethanol Plant, Range Fuels Soperton Plant, LLC (01/2009) (pdf 2.21mb) |
| DOE/EA-1645 |
Environmental Assessment for Department of Energy Loan Guarantee for Sage Electrochromics SageGlass High Volume Manufacturing Facility in Faribault, MN (07/2009) |
| DOE/EA-1644 |
Kildeer to Mountain Transmission Project Pre-Decisional Environmental Assessment (May 2009) |
| DOE/EA-1643 |
Environmental Assesment For 10 CFR Part 431 Energy Conservation Program for Commercial and Industrial Equipment: Energy Conservation Standards for Commercial Ice-Cream Freezers; Self-Contained Commercial Refrigerators, Commercial Freezers, and Commercial Refrigerator-Freezers without Doors; and Remote Condensing Commercial Refrigerators,Commercial Freezers, and Commercial Refrigerator-Freezers (12/2008) (pdf 266.62kb) |
| DOE/EA-1642 |
Design and Construction of an Early Lead Mini-Fischer-Tropsch Refinery at the University of Kentucky Center for Applied Energy Research near Lexington, Kentucky Environmental Assessment (07/2009) |
| DOE/EA-1638 |
Environmental Assessment for Department of Energy Loan Guarantee to Solyndra, Inc. for Construction of a Photovoltaic Manufacturing Facility and Leasing of an Existing Commercial Facility in Fremont, CA (03/2009) (pdf 1.94mb) |
| DOE/EA-1637 |
Environmental Assesment For 10 CFR 431 Energy Conservation Program for Commercial and Industrial Equipment: Packaged Terminal Air Conditioner and Packaged Terminal Heat Pump Energy Conservation Standards; Final Rule (10/2008) (pdf 333.69kb) |
| DOE/EA-1636 |
Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (03/2009) |
| DOE/EA-1633 |
Environmental Assessment for Green Mountain Reservoir Substitution and Power Interference Agreements (12/2008) (pdf 35.65mb) |
| DOE/EA-1631 |
Final Environmental Assessment for Department of Energy Loan Guarantee for Beacon Power Corporation Frequency Regulation Facility in Stephentown, NY (02/2009) (pdf 7.91mb) |
| DOE/EA-1628 |
Environmental Assessment for Construction and Operation of a Proposed Lignocellulosic Biorefinery, POET Project LIBERTY, LLC. (09/2008) (pdf 19.31mb) |
| DOE/EA-1626 |
Final Environmental Assessment for Midwest Geological Sequestration Consortium (MGSC) Phase III Large-Scale Field Test (10/2008) (pdf 4.68mb) |
| DOE/EA-1624 |
Environmental Assessment for Auburn Landfill Gas Electric Generators and Anaerobic Digester Energy Facilities, Auburn, New York (12/2008) (pdf 4.13mb) |
| DOE/EA-1622 |
University of Nevada, Las Vegas Research Foundation Solar Technology Center Final Environmental Assessment (01/2009) (pdf 5.65mb) |
| DOE/EA-1621 |
Oregon Institute of Technology (OIT) Deep Geothermal Well and Power Plant Project Final Environmental Assessment (09/2008) (pdf 5.08mb) |
| DOE/EA-1620 |
Burbank Hydrogen Fueling Station Project Final Environmental Assessment (08/2008) (pdf 5.97mb) |
| DOE/EA-1616 |
Environmental Assessment for Proposed Carbon Research Center Project at Southern Company Services' Power Systems Development Facility (09/2008) (pdf 1.87mb) |
| DOE/EA-1613 |
Environmental Assessment for the Proposed High Explosive Pressing Facility Finding of No Significant Impact for the Proposed High Explosive Pressing Facility (06/2008) (pdf 2.30mb) |
| DOE/EA-1611 |
Environmental Assessment for Interconnection Request for the Colorado Highlands Wind Project, Logan County, Colorado (02/2009) (pdf 27.42mb) |
| DOE/EA-1607 |
Final Environmental Assessment for Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium (06/2009) |
| DOE/EA-1605 |
Environmental Assessment for Biomass Cogeneration and Heating Facilities at the Savannah River Site (08/2008) (pdf 801.58kb) |
| DOE/EA-1604 |
Final Environmental Assessment for Construction and Operation of a Potable Water Line at the Rocky Mountain Oilfield Testing Center/Naval Petroleum Reserve No. 3 (10/2008) (pdf 2.37mb) |
| DOE/EA-1603 |
Final Environmental Assessment for the Expansion of Permitted Land and Operations at the 9940 Complex and Thunder Range at Sandia National Laboratories/New Mexico (03/2008) (pdf 3.84mb) |
| DOE/EA-1602 |
Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (11/2008) (pdf 15.28mb) |
| DOE/EA-1599 |
Environmental Assesment Disposition of Radio Actively Contaminated Nickel Located at the East Tennessee Technology Park, Oak Ridge, Tennessee, and the Paducah Gaseous Diffusion Plant, Paducah, Kentucky, for Controlled Radiological Applications (06/13/2008) |
| DOE/EA-1597 |
Final Environmental Assessment for Construction and Operation of a Proposed Ethanol Cellulosic Ethanol Plant, Range Fuels, Inc. (10/2007) |
| DOE/EA-1595 |
Environmental Assessment for the Davis-Mead 230-kV Transmission Line Reconductor Project (11/2007) (pdf 2.41mb) |
| DOE/EA-1593 |
Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject (08/2007) |
| DOE/EA-1592 |
Environmental Assessment for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the Kansas City Plant (04/2008) |
| DOE/EA-1588 |
Sacramento Municipal Utility District Final Environmental Assessment (01/2007) |
| DOE/EA-1585 |
Environmental Assessment for the Proposed Decontamination and Demolition of Building 301 at Argonne (03/2007) |
| DOE/EA-1584 |
Final Environmental Assessment for the Sand Point Wind Installation Project, Sand Point, Alaska (09/2009) |
| DOE/EA-1583 |
Final Site-wide Environmental Assessment for Rocky Mountain Oilfield Testing Center/Naval Petroleum Reserve No. 3 (10/2008) (pdf 8.11mb) |
| DOE/EA-1579 |
Environmental Assessment for Proposed Perched Groundwater Corrective Measures (07/2007) |
| DOE/EA-1576 |
Olympia Peninsula Transmission Line Reinforcement Project (03/2008) |
| DOE/EA-1575 |
Environmental Assessment for the Oak Ridge Science and Technology Project at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (02/2008) |
| DOE/EA-1574 |
Environmental Assessment for U-233 Stabilization, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory Oak Ridge, Tennessee (03/2007) |
| DOE/EA-1573 |
Finding of No Significant Impact and Final Environmental Assessment of Three Site Development Projects at the National Renewable Energy Laboratory South Table Mountain Site (07/2007) |
| DOE/EA-1571 |
Environmental Assessment for The Ohio State University, Ohio 4-H center with Green Building Technologies (12/2006) |
| DOE/EA-1570 |
Final Environmental Assessment for Construction and Operation of Neutrinos at the Main Injector Off-Axis Electron Neutrino Appearance Experiment at the Fermi National Accelerator Laboratory, Batavia, Illinois, and St. Louis County, Minnesota (06/2008) (pdf 16.87mb) |
| DOE/EA-1569 |
Environmental Assessment for the Environmental Remediation of Lawrence Livermore National Laboratory at Site 300 Pit 7 Complex (01/2007) |
| DOE/EA-1568 |
Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site (10/2006) |
| DOE/EA-1565 |
Environmental Assessment for Adopted Energy Conservation Standards for Distribution Transformers (07/2007) |
| DOE/EA-1563 |
Environmental Assessment for the National Pollutant Discharge Elimination System Stormwater Compliance Alternatives at the Savannah River Site (06/2007) |
| DOE/EA-1562 |
Environmental Assessment for the Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (01/2007) |
| DOE/EA-1558 |
Environmental Assessment for the National Synchroton Light Source II at Brookhaven National Laboratory (09/2006) |
| DOE/EA-1557 |
Environmental Assessment for the National Security Test Range (04/2007) |
| DOE/EA-1555 |
Environmental Assessment for the Proposed Consolidation and Expansion of Idaho National Laboratory Reseach and Development at a Science and Technology Campus (03/2007) |
| DOE/EA-1552 |
Environmental Assessment for the Decontamination, Demolition, and Removal of Certain Facilities at West Valley Demonstration Project (09/2006) |
| DOE/EA-1548 |
Finding of No Significant Impact and Final Environmental Assessment for the Y-12 Potable Water System Upgrade (03/2006) |
| DOE/EA-1547F |
Environmental Assessment for the Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington (03/2006) |
| DOE/EA-1545 |
Environmental Assessment for the Proposed Withdrawal of Public Lands Within and Surrounding the Caliente Rail Corridor, Nevada (12/2005) (pdf 1.70mb) |
| DOE/EA-1544 |
Environmental Assessment for the Proposed Anadarko/Veritas Salt Creek 3D Vibroseis Project (06/2005) |
| DOE/EA-1542 |
Final Environmental Assessment for the Burleigh County Wind Center (08/2005) (pdf 4.92mb) |
| DOE/EA-1541 |
Demolition of Building 51 and the Bevatron at Lawrence Berkeley National Laboratory (03/2008) |
| DOE/EA-1538 |
Environmental Assessment for the Safeguards and Security Upgrades for Storage of Plutonium Materials at the Savannah River Site (SRS) (12/2005) (pdf 560.19kb) |
| DOE/EA-1535 |
Uranium Leasing Program Final Programmatic Environmental Assessment (07/2007) |
| DOE/EA-1534 |
Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan (01/2007) |
| DOE/EA-1533 |
Environmental Assessment for the Proposed Gas Main and Distribution System Upgrade for Pantex Plant, Amarillo, Texas (08/2005) |
| DOE/EA-1532 |
Final Environmental Assessment for the Proposed Consolidation of Neutron Generator Tritium Target Loading Production (06/2005) (pdf 321.74kb) |
| DOE/EA-1530 |
Environmental Assessment for Proposed Energy Conservation Standards for Residential Furnaces and Boilers (09/2007) |
| DOE/EA-1528 |
Environmental Assessment for the Storage of Tritium-Producing Burnable Absorber Rods in K-Area Transfer Bay at the Savannah River Site (06/2005) |
| DOE/EA-1527 |
Environmental Assessment and Corrective Measures Study Report for Remediating Contamination at Lawrence Berkeley National Laboratory Regulated under the Resource Conservation and Recovery Act (09/2005) |
| DOE/EA-1523 |
Environmental Assessment to Address Proposed Site Modifications at the Strategic Petroleum Reserve's West Hackberry Raw Water Intake Structure Site, Parish, Louisiana (11/2005) (pdf 4.03mb) |
| DOE/EA-1521 |
Environmental Assessment for Spring Canyon Wind Project, Logan County, Colorado (06/2005) |
| DOE/EA-1519 |
Environmental Assessment for the Proposed Decontamination and Decommissioning of the Zero Power Reactors (Building 315) at Argonne National Laboratory (04/2005) |
| DOE/EA-1518 |
Environmental Assessment of the Kootenai River Ecosystem Project (06/2005) (pdf 3.77mb) |
| DOE/EA-1517 |
Environmental Assessment for the Design and Construction of a Fuel Ethanol Plant, Jasper County, Indiana (04/2005) |
| DOE/EA-1516 |
Environmental Assessment for the Proposed Clipper Windpower, Inc. Low Wind Speed Turbine Demonstration Project, Carbon County, Wyoming (01/2005) |
| DOE/EA-1515 |
Final Environmental Assessment for Proposed Closure of the Airport Landfills Within Technical Area 73 at Los Alamos National Laboratory, Los Alamos, New Mexico (05/2005) |
| DOE/EA-1514 |
Environmental Assessment, U.S. Department of Energy, Conveyance of Parcel ED-6 to the City of Oak Ridge, Tennessee (05/2007) |
| DOE/EA-1513 |
Environmental Assessment for the National Pollutant Discharge Elimination System (NPDES) Wastewater Permit Compliance Alternatives at the Savannah River Site (04/2005) |
| DOE/EA-1510 |
Final Environmental Assessment for the Alternate Financed Facility Modernization (01/2005) |
| DOE/EA-1508 |
Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project (11/2005) |
| DOE/EA-1506 |
Final Environmental Assessment for Thermal Conversion Process (TCP) Technology (12/2004) |
| DOE/EA-1505 |
Environmental Assessment for the Proposed Increase in the Facility Capacity and Petroleum Inventory at the Strategic Petroleum Reserve's Bryan Mound Storage Facility, Texas (11/2004) |
| DOE/EA-1503 |
Environmental Assessment, Vermont Electric Power Company Proposed Northern Loop Project (10/2004) |
| DOE/EA-1501 |
Environmental Assessment for the Construction, Operation, and Closure of the Burma Road II Borrow Pit at the Savannah River Site (07/2004) |
| DOE/EA-1499 |
Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nevada Test Site Final Environmental Assessment (08/2004) |
| DOE/EA-1498 |
Environmental Assessment for the Advanced Coal Utilization Byproduct Beneficiation Processing Plant Ghent Power Station, Carroll County, Kentucky (01/2005) (pdf 944.15kb) |
| DOE/EA-1495 |
Environmental Assessment and Finding of No Significant Impact of the USEC Inc. American Centrifuge Lead Cascade Facility at Piketon, Ohio (01/2004) |
| DOE/EA-1494 |
Final Environmental Assessment for Activities Using Biological Simulants and Releases of Chemicals at the Nevada Test Site (06/2004) |
| DOE/EA-1493 |
Environmental Assessment for Greenidge Multi-Pollutant Control Project (08/2004) |
| DOE/EA-1492 |
Environmental Assessment and Finding of No Significant Impact for the Rocky Flats Environmental Technology Site Pool and Land Configuration (10/2004) |
| DOE/EA-1490 |
Environmental Assessment for the Sharyland Utilities, L.P. Proposed 138-kV DC Mexico Tie Project Hidalgo County, TX (08/2004) |
| DOE/EA-1489 |
Environmental Assessment for the Construction and Operation of the Howard T. Ricketts Laboratory (01/2006) |
| DOE/EA-1488 |
Environmental Assessment for the U-233 Disposition, Medical Isotope Production, and Building 3019 Complex Shutdown at the Oak Ridge National Laboratory (12/2004) |
| DOE/EA-1486 |
Final Environmental Assessment Methow Valley Irrigation District Project East and West Diversion Screening Proposal (03/2004) |
| DOE/EA-1485 |
Environmental Assessment for the Nisqually Transmission Line Relocation Project (01/2005) |
| DOE/EA-1483 |
Environmental Assessment for Decontamination and Decommissioning of the Juggernaut Reactor at Argonne National Laboratory – East Argonne, Illinois (03/2004) |
| DOE/EA-1482 |
Environmental Assessment for Pilot Experiment for Geological Sequestration of Carbon Dioxide in Saline Aquifer Brine Formations, Frio FOrmation, Liberty County, Texas (10/2003) |
| DOE/EA-1478 |
Hoover Dam Bypass Project Phase II Environmental Assessment (10/2003) |
| DOE/EA-1477 |
Environmental Assessment for Lignite Fuel Enhancement Project, Coal Creek Station, Great River Energy, Underwood, North Dakota (11/2003) |
| DOE/EA-1476 |
Environmental Assessment for Toxecon Retrofit for Mercury and Multi-Pollutant Control, Presque Isle Power Plant, Marquette, Michigan (09/2003) |
| DOE/EA-1475 |
Chariton Valley Biomass Project Final Environmental Assessment and Finding of No Significant Impact (07/2003) |
| DOE/EA-1473 |
Environmental Assessment for the Partial Funding of a Proposed Life Sciences Building at Brown University, Providence, Rhode Island (07/2003) |
| DOE/EA-1472 |
Environmental Assessment for the Commercial Demonstration of the Low NOx Burner/Separated Over-Fire Air (LNB/SOFA) Integration System Emission Reduction Technology, Finney County, Kansas (03/2003) |
| DOE/EA-1471 |
Environmental Assessment for the Transportation of Highly Enriched Uranium from the Russian Federation to the Y-12 National Security Complex and Findings of No Significant Impact (01/2004)(pdf 738.74kb) |
| DOE/EA-1470 |
Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment (10/2004) |
| DOE/EA-1467 |
Final Environmental Assessment and Finding of No Significant Impact Bonneville-Alcoa Access Road Project (02/2004) |
| DOE/EA-1466 |
Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site (04/2003)(pdf 874.98kb) |
| DOE/EA-1465 |
Environmental Assessment Wind Energy Center Edgeley/Kulm Project, North Dakota (04/2003) |
| DOE/EA-1464 |
Environmental Assessment for Proposed Corrective Measures at Material Disposal Area H within Technical Area 54 at Los Alamos National Laboratory, Los Alamos, New Mexico (03/2004) |
| DOE/EA-1463 |
Environmental Assessment for Interim Rule, 10 CFR 433, Energy Efficiency Standards for New Federal Commercial and High-Rise Multi-Family Residential Buildings and 10 CFR 435, Energy Efficiency Standards for New Federal Residential Low-Rise Residential Buildings (11/2007) (pdf 188.91kb) |
| DOE/EA-1462 |
Environmental Assessment for the Accelerated Tank Closure Demonstration Project (06/2003) |
| DOE/EA-1460 |
I'SOT Canby District Heating Project, Modoc County, California Final Environmental Assessment (03/2003) |
| DOE/EA-1458 |
Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site (02/2003) |
| DOE/EA-1457 |
Environmental Assessment for the Center for Integrated Nanotechnologies at Sandia National Laboratories/New Mexico (03/2003) |
| DOE/EA-1456 |
Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project (10/2006) |
| DOE/EA-1455 |
Environmental Assessment for Enhanced Operations of the Advanced Photon Source at Argonne National Laboratory-East, Argonne, Illinois (06/2003) |
| DOE/EA-1454 |
Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F, 100-H, and 100-N Areas (03/2003) |
| DOE/EA-1452 |
Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site (11/2002) |
| DOE/EA-1451 |
Environmental Assessment for the Leasing of Facilities and Equipment to USEC Inc. (10/2002) |
| DOE/EA-1449 |
Commercial Demonstration of the Manufactured Aggregate Processing Technology Utilizing Spray Dryer Ash, King George County, Virginia (08/2002) |
| DOE/EA-1447 |
Final Environmental Assessment for the Proposed Consolidation of Certain Dynamic Experimentation Activities at the Two-Mile Mesa Complex Los Alamos National Laboratory, Los Alamos, New Mexico (11/2003) |
| DOE/EA-1446 |
Final Environmental Assessment for the Test Capabilities Revitalization at Sandia National Laboratories/New Mexico (01/2003) |
| DOE/EA-1445 |
Construction of a Child-Care Facility (09/2002) |
| DOE/EA-1444 |
Construction of New Office Building, Child-Care Facility, Parking Garage, and Storm Water Retention Pond (09/2002) |
| DOE/EA-1442R |
Revised Final Environmental Assessment for the Biosafety Level 3 Facility at Lawrence Livermore National Laboratory (01/2008) |
| DOE/EA-1442 |
Environmental Assessment for The Proposed Construction and Operation of a Biosafety Level 3 Facility at Lawrence Livermore National Laboratory (12/2002) |
| DOE/EA-1441 |
Final Environmental Assessment for Construction and Operation of the Molecular Foundry (02/2003) |
| DOE/EA-1440-S-1 |
Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's South Table Mountain Complex (05/2008)(pdf 4.57mb) |
| DOE/EA-1440 |
Final Environmental of the National Renewable Energy Laboratory's (NREL) South Table Mountain Complex (02/2003) |
| DOE/EA-1438 |
Finding of No Significant Impact and Final Environmental Assessment for the Future Location of Heat Source/Radioisotope Power System Assembly and Testing and Operations Currently Located at the Mound Site (08/2002) |
| DOE/EA-1437 |
Environmental Assessment for the National Compact Stellarator Experiment at the Princeton Plasma Physics Laboratory (09/2002) |
| DOE/EA-1434 |
Environmental Assessment for the Sunrise II Water Supply (10/2002) |
| DOE/EA-1433 |
Decision Notice and Environmental Assessment for Cooperative Gypsy Moth Project (04/2002) |
| DOE/EA-1431 |
Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program, Los Alamos, New Mexico (09/2003) |
| DOE/EA-1430 |
Environmental Assessment for the Installation and Operation of Combustion Turbine Generators at Los Alamos National Laboratory, Los Alamos, New Mexico (12/2002) I Water Supply (10/2002) |
| DOE/EA-1429 |
Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory (08/2002) |
| DOE/EA-1426 |
Environmental Assessment for the Linac Coherent Light Source Experimental Facility at the Stanford Linear Accelerator Center, Stanford, California (12/2002) |
| DOE/EA-1425 |
Raymond-Cosmopolis Transmission Line Rebuild Project, Final Environmental Assessment (08/2003) |
| DOE/EA-1422 |
Final Site-Wide Environmental Assessment (SWEA of the Sandia National Laboratories/California (01/2003) |
| DOE/EA-1418 |
Otter Tail Power Company Advanced Hybrid Particulate Collector Big Stone City, Grant County, South Dakota, Final Environmental Assessment (06/2002) |
| DOE/EA-1416 |
Demonstration of an Integrated Power Generation System for Coal Mine Waste Methane Utilization, Environmental Assessment (06/2002) |
| DOE/EA-1415 |
Environmental Assessment for the Proposed Conveyance of the American Museum of Science and Energy and Associated Property, Parcel G, and Parcel 279.01 (03/2007) |
| DOE/EA-1414 |
Final Environmental Assessment on the Implementation of the Authorized Limits Process for Waste Acceptance at the C-746-U Landfill Paducah Gaseous Diffusion Plant Paducah, Kentucky (08/2002) |
| DOE/EA-1412 |
Environmental Assessment Expansion of the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center, Hanford Site, Richland, Washington (11/2002) |
| DOE/EA-1411- Final EA; Errata;FONSI |
Final Environmental Assessment for the East Altamont Energy Center Application for Certification (01-AFC-4) Alameda County (09/2002) |
| DOE/EA-1409 |
Proposed Issuance of an Easement to the Public Service Co. of New Mexico for the Construction and Operation of an 12- inch Natural Gas Pipeline within Los Alamos National Laboratory (07/2002) |
| DOE/EA-1408 |
Proposed Future Disposition of Certain Cerro Grande Fire, Flood and Sediment Retention Structures at Los Alamos National Laboratory, Los Alamos, NM (08/2002) |
| DOE/EA-1405 |
Environmental Assessment for Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington (03/2002) |
| DOE/EA-1402 |
Environmental Assessment for Methane Energy and Agricultural Development Port of Tillamook Bay Dairy Digester Project, Tillamook County, Oregon (01/2002) |
| DOE/EA-1399 |
Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site (07/2002) |
| DOE/EA-1396 |
Final Environmental Assessment Small-Scale Geothermal Power Plant and Direct-Use Geothermal Application at AmeriCulture Inc., Cotton City, NM (08/2002) |
| DOE/EA-1395 |
Final Environmental Assessment for Right-of-Way Maintenance in the Sacramento Valley, California (08/2005) (NOTE: Electronic files are not available due to sensitive content) |
| DOE/EA-1394 |
Environmental Assessment for Authorizing the Puerto Rico Electric Power Authority (PREPA) to allow Public Access to the Boiling Nuclear Superheat (BONUS) Reactor Building, Ricon, Puerto Rico (01/2003) |
| DOE/EA-1393 |
Programmatic Environmental Assessment for the U. S. Department of Energy, Oak Ridge Operations Implementation of a Comprehensive Management Program for the Storage, Transportation, and Disposition of Potentially Reusable Uranium Materials (10/2002) |
| DOE/EA-1388 |
Environmental Assessment of Ground Water Compliance at the Shiprock Uranium Mill Tailings Site (09/2001) |
| DOE/EA-1386 |
Final Environmental Assessment for the Remote-handled Waste Disposition Project (02/2009) (pdf 3.37mb) |
| DOE/EA-1384 |
Environmental Assessment Proposed Improvements at the Thomas Jefferson National Accelerator Facility Newport News, Virginia (06/2002) |
| DOE/EA-1383 |
Amendment of Presidential Permit (PP-68) San Diego Gas and Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California (10/2001) |
| DOE/EA-1378 |
Final Site-Wide Environmental Assessment of National Renewable Energy Laboratory's National Wind Technology Center (05/2002) |
| DOE/EA-1376 |
Environmental Assessment for Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory (02/2003) (pdf 1.11mb) |
| DOE/EA-1375 |
Environmental Assessment for Construction and Operation of a New Office Building and Related Structures at TA-3 within Los Alamos National Laboratory (07/2001) (pdf 977.51kb) |
| DOE/EA-1374 |
Environmental Assessment for the Avian Predation on Juvenile Salmonids in The Lower Columbia River Research Project (04/2001) |
| DOE/EA-1372 |
Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment (04/2003) |
| DOE/EA-1371 |
Integrated Natural Resources Management Plan, Environmental Assessment, and Finding of No Significant Impacts for Rock Creek Reserve (08/2001) |
| DOE/EA-1367 |
White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam (04/2003) |
| DOE/EA-1366 |
Santiam-Bethel Transmission Line Project Environmental Assessment (02/2001) |
| DOE/EA-1363 |
Joint Environmental Assessment of the California Department of Food and Agriculture Curly Top Virus Control Program for the Bureau of Land Management and Department of Energy (04/2002) |
| DOE/EA-1357 |
Presidential Permit PP-226, Brownsville Public Utilities Board (08/2001) |
| DOE/EA-1356 |
Environmental Assessment Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation Oak Ridge, Tennessee (02/2003) |
| DOE/EA-1354 |
Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001) |
| DOE/EA-1345 |
Environmental Assessment for Cleanup and Closure of the Energy Technology Engineering Center (03/2003) |
| DOE/EA-1344 |
Environmental Assessment for Amended Energy Conservation Standards for Clothes Washers (12/2000) |
| DOE/EA-1342 |
Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/2001) (pdf 0.6mb) |
| DOE/EA-1339A |
Environmental Assessment Addendum Disposition of Additional Waste at the Paducah Site Paducah, Kentucky (12/2003) |
| DOE/EA-1328 |
Tanner Electric Transmission Line Project Final Environmental Assessment and Finding of No Significant Impact (08/2000) |
| DOE/EA-1326 |
Environmental Assessment and Finding of No Significant Impact for the Tucannon River Spring Chinook Captive Broodstock Program (May 2000) |
| DOE/EA-1313 |
Environmental Assessment of Ground Water Compliance at the Monument Valley Arizona, Uranium Mill Tailings Site (03/2005) |
| DOE/EA-1312 |
Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (09/1999) |
| DOE/EA-1301 |
Final Environmental Assessment - Idaho Department of Fish and Game Captive Rearing Initiative for Salmon River Chinook Salmon (10/2000) |
| DOE/EA-1300 |
Environmental Assessment for the Nevada Test Site Corporation's Desert Rock Sky Part at the Nevada Test Site (03/2000) |
| DOE/EA-1295 |
Environmental Assessment for the Proposed Decommissioning and Decontamination of Building 301 Hot Cell Facility at Argonne National Laboratory (09/2000) |
| DOE/EA-1282-SA-03 |
Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA (11/2002)(pdf 39.20kb) |
| DOE/EA-1269 |
Environmental Assessment for Decontamination and Volume Reduction System at the Los Alamos National Laboratory (06/1999)(pdf 338.75kb) |
| DOE/EA-1268 |
Environmental Assessment of Ground Water Compliance at the Tuba City, Uranium Mill Tailings Site (12/1998) |
| DOE/EA-1257 |
Bonneville - Hood River Vegetation Management (09/1998) (pdf 7.92mb) |
| DOE/EA-1241 |
Bonneville Power Administration Grizzly Substation Fiber Optic Project (02/1998) |
| DOE/EA-1193 |
Environmental Assessment for the Atmospheric Radiation Measurement (ARM) Program North Slope of Alaska and Adjacent Artic Ocean Cloud and Radiation Testbed (CART) Site (02/1997)(pdf 2.42mb) |
| DOE/EA-1175-A |
Environmental Assessment Addendum for the Proposed Title Transfer of East Tennessee Technology Park Land and Facilities (07/2003) |
| DOE/EA-1162 |
Columbia River Gorge Vegetation Management Project (06/1996) (pdf 7.92mb) |
| DOE/EA-1113-A |
Environmental Assessment Addendum For the Proposed TitleTransfer of Parcel ED-1 (04/2003) |
| DOE/EA-1068 |
Programmatic Environmental Assessment for the State Energy Conservation Program (SECP) (06/1996)(pdf 293.87kb) |
| DOE/EA-0387 |
Site-Wide Environmental Impact Statement for the Y-12 national Security Complex (10/2009) |
| DOE/EA-0336 |
Environmental Assessment for the Proposed New Agreement for Peaceful Nuclear Cooperation Between The United States and Japan and an Associated Subsequent Arrangement for the Return of Recovered Plutonium from Euratom to Japan (09/1987) |
| |
|